North Lincs Structures have been working with Croda on their £27million investment to their Hull facility since 2018.
We have worked to refurbish and install new structures on the plant to increase their exisiting capacity to almost double to meet growing market demand.
Some of the projects include;
Pipebridges supporting gas, chemical and water lines.
Plant and vessel support platforms.
Walkways, gantry and stair access.
Lighting columns/supports.
Reactor support structures.

We have supplied and installed approx 250T of hotrolled steel to the overall project.

960

CRODA

PROJECT TYPE: PETRO CHEMICAL

MAIN CONTRACTOR: OSL/ CRODA

LOCATION: CHEMICAL REACTOR PLANT, HULL

SIZE:AMMONIA STORAGE: 13m x 16m X 9m
R8/R9: 22m x 27m x 20m
LER CONTROL ROOM: 21m x 5m x 2m
PIPEBRIDGE N/S: 73m x 41m
PB7: 13m x 14m
PB25: 8.7m x 6.5m
SOUTH SIDE PUMP RACK: 4.8m x 14m

Request a Quote Enquire
BCSA Logo
ISOQAR Registered Logo
LABC Logo
Safe Contractor Approved Logo
SCI Steel Knowledge Logo

© North Lincs Structures Ltd 2020 | Steel's our Forte!

Registered Office: 6 Pippin Drive Bottesford, Scunthorpe, South Humberside, DN16 3TR
Registered in England & Wales, Company No: 02818857